sailorand
Past British Columbia Chapter Leader
We all have things that we have done to our units and things we are thinking of doing.
Heres my list
Things done
120 volt meter permenently installed
12 volt meter from Harbour Freight
things I wish to do
amp meter to measure amps out of the batteries
surge protector, permently installed
house type water pressure regular then a high pressure food grade hose that is 30ft long (25 feet is always 5 feet to short) to be installed behind the docking staion
change around the docking station to put the phone and TV inputs above the water inlets
What are your upgrades??
Heres my list
Things done
120 volt meter permenently installed
12 volt meter from Harbour Freight
things I wish to do
amp meter to measure amps out of the batteries
surge protector, permently installed
house type water pressure regular then a high pressure food grade hose that is 30ft long (25 feet is always 5 feet to short) to be installed behind the docking staion
change around the docking station to put the phone and TV inputs above the water inlets
What are your upgrades??