I guess this is where this goes.
I've got a hydraulic leak at the pump of the level up system, there is a mobile tech coming out this week, so I was wondering if its o.k to do a relevel with the level up with the slideouts out (extended) has anyone done this without incident or should I bring the slideouts in (retract). Thanks
I've got a hydraulic leak at the pump of the level up system, there is a mobile tech coming out this week, so I was wondering if its o.k to do a relevel with the level up with the slideouts out (extended) has anyone done this without incident or should I bring the slideouts in (retract). Thanks